Post Offer Free
Shandong Hock Mining Engineering Co.,Ltd
Shandong Hock Mining Engineering Co.,Ltd  

Gold Index: 579

You are here: home  > geogrid  > polyester mesh geogrid geosynthetics geonets

polyester mesh geogrid geosynthetics geonets 

Price: 0.6~6.0 USD 
Payment Terms: T/T,L/C,WU 
Place of Origin: Shandong, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: JD PET 400X400 MS
Production Capacity: 50000m2 per day
Delivery Date: within 10 days after receip...
Material Polyes: Polyester
Width: 1-5m
Certificate: CE,ASTM,MA,Russia,Australia...
Elongation: ≤13%
Means of Transport: Ocean
Packing: PE film
Brand Name: mine grid
Strength: 30-1100kN/m
Length: 50-300m
Coating: PVC

mining geogrid 400/400,Mine Grid:integrity, flexibility,lightness,high tensile strength, nice properties of fire-resistance and anti-static,support.

Detailed Product Description

1.Large square,high tensile strength 400-400kN
2.Simple and convenient construction
3.Fire-resistant,antistatic
4.mine grid

Mine Grid (Flexible Support Grid)
Introduction
Geogrid is knitted by polymer yarns with high strength, high modulus and low creep and coated with advanced technology. It is specially used as the substitute of metallic mesh for longwall face recovery and you do not need to weave the mesh frequently on site before the longwall stops.
Polyester mesh is going to be lift at the position 15-25 meters away from the stopping line with winches and fixed pulley at one time. Mesh laying, lifting and advance is circulated with the share pass. Mesh application affords the technical innovation meaning to improve the longwall face recovery efficiency and security.
polyester mesh is 3-6 m wide and 50-200 m long with tensile strength ranging from 100kn/m-800kn/m. Mesh with strength 800-1000kn/m for special projects can also be supplied. We will manufacture mesh based on the parameters of longwall faces.
Application scopes:
Longwall face recovery for roof support
On both ends of longwall face for roof support
Ultra-high drainage tunnel and old tunnel for roof support
Gangue blocking,buffering and protection of the declining longwall faces
Buffering and protection of the blast area
Slice mining longwall faces
Declining longwall faces for roof support
Characteristics:
Large square, flexible and light, strong tensile strength
Simple and convenient construction
Fire-resistant and antistatic
Avoid frequent mesh transportation and weaving
High safty and low labour
Flexible production with different strength and specifications
Technical data
Type
Tensile strength, KN/m
Elongation at break, %
Weight, g/sqm
Aperture size mm x mm
    warp
     weft
JD PET100x80 MS
    100
      80
                 13
        800
              30 x 30
JD PET200x200 MS
    200
     200
                 13
      2500
              20 x 30
JD PET400x400 MS
    400
     400
                 13
      3500
              10 x 30
JD PET600x400 MS
    600
     400
                 13
      4500
              10 x 20
We are able to produce mesh with different types and specifiactions according to the requirements of projects.
The data hereinbefore was derived from the experiments in the lab. They may change along with the application spots.
Functions and effects:
1.Laying finished at one time is able to avoid the phenomenon that workers transport and enter the downspoutings to connect the mesh frequently, reduce the labour intensity and improve the secure condition.
2. After laying on the working face at one time, it is needless to connect the mesh during working, therefore, connecting time is saved and the production efficiency is improved.
3. The flexible mesh is integral after laying, the overframe and backward movement is fast and effective. In comparison with the metal mesh, the laying is partially slow.
4.Mesh laying can be carried out together with the coal-splitting, pushing and support advance, therefore, the working speed steps up.
5.Fast laying almost has no impact on the shocks advancing speed and reduces the advanced influence of working faces on the coal wall.
6. Increase the speed of terminal mining on the working surface which is sensible to self-ignite easily and reduce the self-ignition risks.
bigPhoto
 Mr. Xueyuan Li
Trader
Tel: 86-537-3238986
Fax: 86-537-3238977
Mobile: 159 6411 8861
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

Shandong Hock Mining Engineering Co.,Ltd [China (Mainland)]


Business Type:Manufacturer, Trading Company, Service
City: Jining
Province/State: Shandong
Country/Region: China (Mainland)

You May Like:

Product (5)